Second Tube in Laz Tunnel on Milos Veliki Highway Section from Pakovrace to Pozega Bored Through
Source: eKapija
Wednesday, 12.04.2023.
12:55
Comments
Illustration (Photo: muratart/shutterstock.com)
Let us remind that, as the PE Roads of Serbia announced on its official YouTube channel, the right tube was bored through in late March, and Vesic informed the public about it back on March 10 on his Twitter account.
What’s characteristic of this section is that it passes through a geographically very demanding terrain, which requires the construction of numerous bridges and tunnels. The construction of this section will shorten the travel time between Cacak and Pozega from the current 45 minutes to 20 minutes.
Take a look at our infomap HERE.
Companies:
Ministarstvo građevinarstva, saobraćaja i infrastrukture Republike Srbije
JP Putevi Srbije Beograd
Comments
Your comment
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.