NavMenu

Četiri atraktivne lokacije za investiranje u turizam, kulturne, istorijske i industrijske objekte u opštini Bač!

Izvor: VIP Fond Ponedeljak, 19.02.2007. 11:42
Komentari
Podeli

Overview:

Municipality of Bač is located in the south-west of Bačka, on the left bank of the river Danube, covering the area of 367 km2. The land is plain, intersected with small waterways and the Danube–Tisa–Danube Canal. Bač is 124 km away from Belgrade Airport and 66 km from Novi Sad. There are six settlements in this municipality: Bač, the administrative centre, Bačko Novo Selo, Plavna, Vajska, Bođani and Selenča. Distance to Belgrade Airport is 124 km and to Novi Sad 65 km.

Population

Bač has 16,268 inhabitants belonging to different groups such as Serbs, Slovaks, Hungarians, Croats and other ethnic minorities. The municipality has extremely rich cultural and religious heritage and three churches of different denominations.

Economy

The structure of the economy is determined by the geographic position of Bač municipality. The principal branches are agriculture, agro industry, construction, trade and hospitality industry. As of 2006, Bač has a total of 2,742 unemployed persons.

Infrastructure

Being situated close to the main transportation network, the municipality has strategic advantages. Bač is situated on the state border with Croatia, and it is just 60km from Novi Sad, 20 km from the Danube, 120 km from Belgrade and 60 km from the Pan-European Transport Corridor 10.

Tourism

Bač municipality has a great potential for tourism with its natural resources, such as Provala lake, the rivers of Krivaj, Mostonga and Jegrička, artificial lakes and the Danube, as the natural border of the municipality. Forests cover the area of 31.4km2, which is suitable for the development of hunting tourism. The municipality also has very diversified and rich cultural and historical heritage and monuments including the Fortress, the monastery of Bođani and the Turkish bath – hamam.

LOCATION 1

Site: Industrial Zone

Total area: 24 ha 54 a 72 m2

Type of ownership: Municipal property

Intended use: Construction of small and middle-sized industrial plant (small-scale industry), construction of business premises / office space, parking spaces, warehouses.

Site description

The industrial zone is ideally located on the crossroads of the M-18 (Bačka Palanka-Odžaci) main road and R-102 (Bač-Bački Petrovac) local road. It is 900 m off the railroad route, 12 km away from the river Danube and 1 km far from Danube-Tisa-Danube Canal. The state border with Croatia is in the vicinity, with the border crossing near Vukovar (Croatia). The local Bačka Palanka- Bač railroad runs close to this area. The zone comprises 65 plots – the size of each of the vacant plots is 10a, approximately 25x40 m. There is a possibility for joining two or more lots into large ones. At present, there is a reinforcement bar factory, a tobacco drier and a small slaughterhouse in the Industrial zone.

Infrastructure

The site has access to power and water supply systems. Extension of sewerage reticulation is underway and telephone lines come right to the border of the location. The existing access roads provide quick connection to the main, local and other roads.

Additional information

Land lease for the period of 99 years is possible. There is also a possibility of accession to the Zone free of charge, but in that case it is obligatory to construct infrastructure facilities on the lot as one of that condition. All the required permits and approvals for the construction on the site could be obtained within only two days. The required planning and regulatory documentation already exists.

LOCATION 2

Site: Provala Lake

Total area: 37 ha

Type of ownership: Municipal and state-owned property

Intended use: Tourism and leisure activity area – sports facilities, restaurants, bungalows, cafés, stores, bus station, etc.

Site description

The lot is located in the immediate vicinity of the lake Provala in Vajska. Vajska is a settlement in Bač municipality, located near the state border with Croatia (Danube). The lake Provala visited by more then 3,000 tourists every summer constitutes a natural tourist resource of this municipality,.

Infrastructure

The site has access to power and water supply systems, telephone connections, but no access to sewer system and gas pipeline. Construction of access roads to the main, local and other roads are planned.

Additional information

Land lease for the period of 99 years is possible. All the required permits and approvals for the construction on the site could be obtained in just a couple of days. The required planning and regulatory documentation already exists.

LOCATION 3

Site: Residential Area in Bačko Novo Selo

Total area: 8 ha 35 a

Type of ownership: Property of Public Utility Enterprise ‘’Vojvodina Šume’’.

Intended use: Residential area with commercial facilities

Site description

It is located on the bank of the river Danube, in the southern part of Bačko Novo Selo, distanced 15 km from Bač. On its west side there is a fish pond. Available area of this location is: 87a 20m2 (for public commercial facilities) and 2ha 48a 90m2 (for residential premises).

Infrastructure

The site has access to power and water supply systems, but no access to sewer system, gas pipeline or telephone connection. Construction of access roads to the main, local and other roads is planned.

Additional information

Land lease for the period of 99 years is possible. All the required permits and approvals for the construction on the site could be obtained within 30 days. The required planning and regulatory documentation already exists.

LOCATION 4

Site: "Vekovi Bača" Old Fortress

Total area: 1ha 92a 31m2

Type of ownership: Municipal and state-owned property

Intended use: Cultural and historic monument with commercial facilities

Site description

Block 591-1 is a protected archaeological site. The total area of the fortress is 73a 63m2 and the size of the forest area around the fortress is 1ha 18a 68m2. Regional R-102 road and Major M-18 road are 2 km away from the fortress.

Infrastructure

The site has access to power and water supply systems, but has no access to sewer system, gas pipeline or telephone connection. The existing access roads provide quick connection to the main, local and other roads.

Additional information

Land lease for the period of 99 years is possible. All the required permits and approvals for the construction on the site could be obtained within 30 days. The required planning and regulatory documentation already exists.

Contact

Ms. Darija Šajin, Head of Municipal Administration

Mr. Tomislav Bogunović, Mayor

Address: Trg Zorana Đinđića 2

21420 Bač

Tel. ++381 21 770 075

or :

Vera Marković, Vojvodina investment promotion Fund VIP / Fond za podršku investicija u Vojvodini – VIP Fond

www.vip.org.yu

+381 21 472 32 40 +381 21 472 32 41

Komentari
Vaš komentar
Potpuna informacija je dostupna samo komercijalnim korisnicima-pretplatnicima i neophodno je da se ulogujete.

Zaboravili ste šifru? Kliknite OVDE

Za besplatno probno korišćenje, kliknite OVDE

Pratite na našem portalu vesti, tendere, grantove, pravnu regulativu i izveštaje.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno, uz konsultacije sa našim ekspertima.