Plan for Line 2 of Future Subway Amended – Tunnel to “Cut Through” Kralja Milana and Kneza Milosa Streets, Rail Connection at Karadjordje’s Park
Source: eKapija
Friday, 23.12.2022.
11:19
Comments
(Photo: JKP Beogradski metro i voz/tenderska dokumentacija, screenshot)
According to eKapija’s unofficial findings, however, not even this solution is entirely certain – alternatively, a rail connection at the underground station Vuk Monument, originally designated for that purpose, is being considered, which would entail even greater changes on the route of the planned second line. According to the technical specification of the job, the consultant Egis Rail has defined a new, more optimal solutions for the section from the Sava Square station to the Grcica Milenka station, prepared in line with the numerous new spatial and planning limitations.
The technical and spatial limitations for the integration of the route of Line 2 on the section from the Sava Square to Grcica Milenka Street are the negative conditions of the NBS for the passing of the tunnel right next to the bank’s building, the negative conditions of the company Serbian Railways Infrastructure on connecting Line 2 with the rainwater collector in Resavska Street and the water tunnel in Slavija, the existing and planned collectors in Juzni Blvd and the newly built facilities and facilities under construction (as per building approvals) in the positions planned for the stations Juzni Blvd and Grcica Milenka.
Read more:
- Seeking Company to Survey Current State of Structures for Second Phase of Lines 1 and 2 of Belgrade Subway
- Tram Line Along Pancevo Bridge to Prokop Instead of First Subway Line, BG Voz to Obrenovac
- Potential Change of Route of Second Subway Line – Propositions Made by Egis Being Considered
- Subsequently Added Subway Route Toward Orlovaca to Feature Seven Stations, Space for Parking in Mirijevo to Be Built Too – Plan for Phase 2 of Line 1 Published
– For said reason, there is a need for surveying a digital topographic plan of the zone of the subway infrastructure which is not previously encompassed by the surveying of the digital topographic plan – clarifies the PUE Beogradski metro i voz.
The tender is open until January 9.
B. P.
Companies:
JKP Beogradski metro i voz Beograd
Tags:
PUE Beogradski metro i voz
Egis Rail
Belgrade Subway
Line 2 of Belgrade Subway
change of Line 2 of Belgrade Subway
geodetic surveying
topographic plan
change of subway route
Comments
Your comment
Naš izbor
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.