More Electricity to Come from South Banat – WV International Planning Construction of Samos Wind Farm of 900 MW Between Alibunar and Kovacica
Source: eKapija
Monday, 15.01.2024.
14:16
Comments
Illustration (Photo: Pixabay.com/Hans)
The area covered by the plan amounts to 174.28 km2, and in the territory of the municipality of Alibunar, it encompasses parts of the cadaster municipalities: Dobrica, Ilandza, Novi Kozjak and Seleus, whereas in the territory of the municipality of Kovacica, it encompasses parts of the cadaster municipalities: Kovacica, Padina, Samos and Uzdin.
The construction is planned in two stages.
In the first stage, the plan is to realize the wind farm Samos 1 with a planned minimum power of 420 MW, whereas in the second stage, the plan is to realize the wind farm Samos 2 with a planned minimum installed power of 468 MW. The maximum height, the total height of the wind generators, will be around 250 m.
The spatial plan was prepared by the Public Enterprise for Spatial and Urban Planning “Institute of Urban Planning of Vojvodina” from Novi Sad, and the early public inspection will last until January 29.
I. Z.
Companies:
Pokrajinski sekretarijat za urbanizam i zaštitu životne sredine Novi Sad
JP Zavod za urbanizam Vojvodine Novi Sad
AAEC Energy Consulting doo Novi Sad
Comments
Your comment
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.