Fast Route Section from Lajkovac to Divci Interchange Opens to Traffic
Source: eKapija
Sunday, 24.12.2023.
10:30
Comments
The 12-kilometer section of the Iverak - Lajkovac expressway, from Lajkovac to the "Divci" interchange, was opened for traffic at 12:00 on Saturday, announced the PE Roads of Serbia. The adopted calculation speed is 100 km per hour.
At the "Lajkovac" interchange, vehicles will be able to enter the route in question in the area of the roundabout, and exit from the route will be possible at the "Divci" interchange. In Divci, as the PE Road of Serbia specifies, vehicles will be able to enter the route in question via two newly built junctions. The exit from the route is at the "Lajkovac" loop in the area of the roundabout.
Most of the expressway route is located in the flood zone of the Kolubara River, about 52% of the route.
The traffic route consists of 4 driving lanes of a total width of 14 meters, four edge strips of a total width of 2 meters, a median strip of 4 meters and two banks of a total width of 3 meters.
– A two-way parking lot was built. During construction, environmental impact control was regularly carried out, water and soil were sampled. With the construction of state road IB category number 27, section Iverak-Lajkovac, the city of Valjevo will be connected to the highway Belgrade - South Adriatic, and will represent a cross link in the road network of the Republic of Serbia. It will also connect parts of Republika Srpska (BiH) with highway E-763 (Belgrade South Adriatic) and further via corridor 10, with Bulgaria and Greece – says the PE Roads of Serbia.
At the "Lajkovac" interchange, vehicles will be able to enter the route in question in the area of the roundabout, and exit from the route will be possible at the "Divci" interchange. In Divci, as the PE Road of Serbia specifies, vehicles will be able to enter the route in question via two newly built junctions. The exit from the route is at the "Lajkovac" loop in the area of the roundabout.
Most of the expressway route is located in the flood zone of the Kolubara River, about 52% of the route.
The traffic route consists of 4 driving lanes of a total width of 14 meters, four edge strips of a total width of 2 meters, a median strip of 4 meters and two banks of a total width of 3 meters.
(Photo: Dejan Aleksić)
– A two-way parking lot was built. During construction, environmental impact control was regularly carried out, water and soil were sampled. With the construction of state road IB category number 27, section Iverak-Lajkovac, the city of Valjevo will be connected to the highway Belgrade - South Adriatic, and will represent a cross link in the road network of the Republic of Serbia. It will also connect parts of Republika Srpska (BiH) with highway E-763 (Belgrade South Adriatic) and further via corridor 10, with Bulgaria and Greece – says the PE Roads of Serbia.
Companies:
JP Putevi Srbije Beograd
Tags:
PE Roads of Serbia
Divci
Iverak
Belgrade South Adriatic highway
Iverak Lajkovac fast route
Kolubara
Comments
Your comment
Naš izbor
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.