Section of Morava Corridor from Pojate to Makresane Opened – Investment in First Digital Highway Worth Around EUR 800 Million
Source: eKapija
Sunday, 30.04.2023.
11:39
Comments
Illustration (Photo: Nagy Szabi/Unsplash)
This, as pointed out, is the first smart highway in our country, that is, the first digital highway. That means that the highway itself and its surroundings will be equipped with sensors and information about the situation on the road, potential crashes and other data, which ensures a high level of traffic safety.
The Morava Corridor is also the widest road in Serbia, with a width of 30 meters, and for its entire length, it will have a total of 11 interchanges, 71 bridges, 23 overpasses, 5 underpasses and 31 culverts. It will also have free internet stations.
According to the president of the municipality of Cicevac, Mirjana Krkic, this highway will mean a lot to both the resident and the economy of the municipality.
– The municipality of Cicevac is currently building the highway E75 and the fast railroad Stalac-Djunis, which is starting right at this moment. With this traffic route, the municipality will get a greater traffic of goods and people, and the municipalities of Cicevac and Varvarin are planning a joint construction of the industrial zone, which is also a big investment – Krkic pointed out in her statement for RTS.
As said, the industrial zone will spread on an area of 22 ha.
According to the president of Serbia, Aleksandar Vucic, the opening of the entire Morava Corridor is expected by the end of 2025.
– In September or October, we are opening the section of 11 kilometers to Kosevo, and by the end of 2024, the section Cacak-Adrani will be opened. Then we will open the remaining 56 kilometers by the end of 2025, whereby the widest digital highway in Serbia will be completed – Vucic pointed out.
As he said, on these 17 kilometers, 7 bridges, 3 overpasses, 6 culverts and 2 supporting walls have been done.
– People will feel the benefits both through new investments and the new industrial zone in Cicevac. This corridor will be used by all the people who go to the spa and Kopaonik – the president emphasized at the opening ceremony.
Also, as said, until the autumn, there will be no road toll on this section.
Take a look at our info map Construction of Highways and Fast Roads in Serbia and the Region.
Tags:
Corridors of Serbia
Bechtel
Enka
Municipality of Ćićevac
Mirjana Krkić
Aleksandar Vučić
Koševo
Adrani
Stalać
Pojate
Makrešane
Đunis
Morava Corridor
Pojate Makrešane section
digital highway
construction of highway E75
construction of fast railroad Stalać Đunis
section to Koševo
construction of industrial zone in Ćićevac
industrial zone Ćićevac
smart highway
Comments
Your comment
Naš izbor
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.