New, Inserted Runway at Belgrade Airport to Be in Use from February 23
Comments
Illustration (Photo: Pixabay.com/Hans Braxmeier)
On the same date, radio-navigation and aid devices for landing on the new runway will be implemented, as will be the changes in the navigation procedures at the airport.
The new runway is 3,500 meters long and will replace the existing one, which will be repaired in the coming period. When the reconstruction is done, the inserted runway will become a parallel taxiway next to the initial runway. These two runways will be connected by a new system of taxiways, including four taxiways for a quick exit.
The inserted runway will also be used in the future, if the main one is not in use for any reason.
This year, the repair of the existing main runway will begin as well. It was built in 1962 and was extended by an additional 400 meters to 3,400 meters in 1978. It has been determined that its load-bearing capacity is no longer sufficient.
Lokacija:
Google Maps
Companies:
A.D. Aerodrom Nikola Tesla Beograd
Tags:
Nikola Tesla Airport
inserted runway
construction of inserted runway
taxiways
construction of taxiways
repair of a runway
Comments
Your comment
Naš izbor
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.