Serbia to Get Floating Facility for Production of Hydrogen on the Sava or the Danube
Source: Tanjug
Wednesday, 12.05.2021.
10:48
Comments
The river Sava (Photo: Suzana Obradović)
– It is a floating platform on the water surface, which will consist of 110 reservoirs for hydrogen, of 50 cubic meters each, above which there would be various facilities powered by wind, solar energy, or combined, for the production of electrical energy which will be used in the process of electrolysis from which hydrogen will be produced – Ilic said at the expert gathering called “Hydrogen Strategy of Serbia”, organized by the Energija Balkana internet portal at the Faculty of Mechanical Engineering in Belgrade.
Ilic added that the surface of the platform would be around half a hectare, so that there would be space for all the planned equipment and that it would be made entirely of wood, including hydrogen reservoirs.
He emphasized that the platform would simultaneously filter the river water used in the production of hydrogen in the spot it is located in.
Tags:
Zoran Ilić
Jovanka Atanacković
Radivoje Mitrović
Zorana Mihajlović
Sava
Danube
floating facility for production of hydrogen
floating platform
hydrogen
electrolysis
Hydrogen Strategy of Serbia
decarbonization
action plan for strategy of development of renewable energy sources
Comments
Your comment
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.