Delta House – A-class office building on 23,000 m2 built with the latest technologies
Source: eKapija
Wednesday, 16.09.2020.
15:36
Comments
(Photo: Delta Holding)
The building will have a total area of 23,000, and two of the total of 11 floors will be a common area, four will be taken up by the seat of Delta Holding, whereas five are meant to be leased. A total of 188 parking spaces have been designed as well.
The investment is worth EUR 40 million, and the plan is for 800 additional workers to be employed at the new premises.
The building will be LEED-certified, which entails the certification of facilities planned and built in line with the principles of green building. It is also designed as an energy efficient building which will use solar panels and collect and use rainwater to irrigate the greenery collect rainwater, and the green area on the parcel will be larger than the developed part of the parcel. As announced, this will be an A-class facility and a high-category office space.
Recycled plastic balls in the service of construction
Protection of the environment is also carried out during the construction of Delta House by using plastic balls that replace heavy concrete in all those places where concrete is not necessary for static reasons. In addition to the fact that the amount of concrete used, and thus the weight of the structure, is smaller, this system also enables the use of significantly thinner slabs in the construction of buildings.
Protection of the environment is also carried out during the construction of Delta House by using plastic balls that replace heavy concrete in all those places where concrete is not necessary for static reasons. In addition to the fact that the amount of concrete used, and thus the weight of the structure, is smaller, this system also enables the use of significantly thinner slabs in the construction of buildings.
(Photo: Velibor Gajović)
The use of this technology also has two environmental benefits. Namely, the balls are made of 100% recycled plastic, and as less concrete is used in construction, less CO2 is emitted into the atmosphere.
The use of recycled plastic balls in the construction of Delta House saved 1,600 cubic metres of concrete and reduced the weight of the structure by 4,000 tonnes.
The use of hollow slabs also reduced the number of pillars and provided larger spans of up to 10.8 metres, without additional beams. By placing 100,000 balls in the structure of a new office building, the CO2 emissions will be reduced by 336 tonnes.
More on the new Delta House office building can be found at www.deltahouse.rs
Companies:
Delta Real Estate d.o.o. Beograd
Tags:
Delta Real Estate
Delta House
office space
construction of office space
construction of office building
LEED standards
A class project
leasing office space
parking spaces
employees
employment
Special Edition Newsletter
Special Edition Newsletter Real Estate and Construction
real estate and construction
Real Estate and Construction Future Projects for New Business Opportunities
Comments
Your comment
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.