Highway section of 6.6 km on Corridor 10 opens for traffic

Source: eKapija Thursday, 20.09.2018. 11:07
Comments
Podeli
Illustration (Photo: gkuna/shutterstock.com)Illustration
The PE Roads of Serbia has announced that the newly built 6.6-km section which is an integral part of the project of the construction of the E-75 highway, Belgrade-Nis-Macedonian border, the section Donji Neradovac-Srpska Kuca and Srpska Kuca-Levosoje, opened for traffic on September 19, at 3 pm.

The section also includes the Bujanovac 1 interchange, which enables a direct entrance and exit from Bujanovac next to Bujanovacka Banja and access to the entire existing network of state roads and local roads in this highway zone.

After the exit from the highway at the interchange and down the parallel alternative road to Vranje, long 2.5 kilometers, in Davidovci, there is a turning towards the Prohor Pcinjski Monastery. The permanent signalization has been installed.


As a part of the section and the Bujanovac 1 interchange opened for traffic while the remaining works were being executed, the PE Roads of Serbia warns all drivers to comply with the installed signalization and be especially careful in the zone where the works are still being carried out, the press release says.
Comments
Your comment
Full information is available only to commercial users-subscribers and it is necessary to log in.

Forgot your password? Click here HERE

For free test use, click HERE

Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno, uz konsultacije sa našim ekspertima.